Gortnalug substation SID planning application
Planning Forms
Volume 1
Volume 2 - Figures and Drawings
- Figure 101 Site boundary
- Figure 102 Site location
- Figure 103 Deposition areas details
- Figure 104 Typical perimeter deer fence and gate details
- Figure 105 Access track
- Figure 106 Site entrance visibility splay
- Figure 107 Site entrance swept path analysis
- Drawing 100 Overall Site Layout (page 1 of 9)
- Drawing 101 Site Location Map (page 2 of 9)
- Drawing 102 Site Location Map (page 3 of 9)
- Drawing 103 Site Location Map (page 4 of 9)
- Drawing 104 Site Location Map (page 5 of 9)
- Drawing 105 Site Location Map (page 6 of 9)
- Drawing 106 Site Location Map (page 7 of 9)
- Drawing 107 Site Location Map (page 8 of 9)
- Drawing 108 Site Location Map (page 9 of 9)
- Drawing 200 Substation Layout
- Drawing 201 Substation Elevations
- Drawing 202 IPP Control Building
- Drawing 203 EirGrid Control Building
- Drawing 204 Tower Elevations
- Drawing 205 Non SW End Mast Details
- Drawing 206 Timber Post and Rail Boundary Details
- Drawing 207 Site Compound Details
- Drawing 208 C2 Chamber Details
- Drawing 209 Gate & Fence Detail
- Drawing 210 Drainage Detail
- Drawing 211 Monopole Lightning Mast Details
- Drawing 212 Telecom Pole
- Drawing 213 Cut & Fill
- Drawing 214a Swept Path Analysis
- Drawing 214b Swept Path Analysis
- Drawing 215 110kV Single Circuit Ducting through Access Track
- Drawing 216 Single Circuit Ducting through Grass Land
- Drawing 217 110kV Double Circuit Ducting through Access Track
- Drawing 218 Typical Drain Crossing Details
- Drawing 219 Ducting Easement Design 33KV And 110KV
Volume 3 - Technical Appendices
TA1 - Landscape and Visual Impact Assessment
- Landscape and Visual Impact Assessment
- Figure 1.1 - Landscape Character Types
- Figure 1.2 - Zone of Theoretical Visibility (ZTV)
- Figure 1.3 - Surrounding Designations
- Figure 1.4 - Viewpoint (VP) locations with ZTV
- Figure 1.5 - VP1 & 2
- Figure 1.6 - VP3 & 4
- Figure 1.7 - VP5 & 6
- Figure 1.8 - VP7 & 8
- Figure 1.9 - VP9 & 10
- Figure 1.10 - VP11
- Figure 1.11 - VP1 Photomontage
- Figure 1.12 - VP3 Photomontage
- Figure 1.13 - VP6 Photomontage (Year 0 and 5)
- Figure 1.14 - VP7 Photomontage (Year 0 and 5)
- Figure 1.15 - VP8 Photomontage (Year 0 and 5)
- Figure 1.16 - VP9 Photomontage
- Figure 1.17 - VP10 Photomontage
- Figure 1.18 - Landscape and Ecology Management Plan
TA2 - Ecological Impact Assessment (EcIA)
TA3 - Archaeological and Architectural Heritage Impact Assessment (AAHIA)
- AAHIA
- Appendix 3a
- Appendix 3b
- Appendix 3c (part 1)
- Appendix 3c (part 2)
- Appendix 3c (part 3)
- Appendix 3c (part 4)
- Appendix 3c (part 5)
- Appendix 3d
TA4 - Flood Risk Assessment (FRA) and Drainage Impact Assessment (DIA)
TA5 - Construction Traffic Management Plan
TA6 - Outline Construction Environmental Management Plan
Outline Construction Methodology